{"id":325,"date":"2021-08-30T10:40:45","date_gmt":"2021-08-30T10:40:45","guid":{"rendered":"http:\/\/powertechelectrical.in\/?p=325"},"modified":"2026-03-25T07:46:53","modified_gmt":"2026-03-25T07:46:53","slug":"hitch-your-wagon-electrical-contractors-find-opportunities-at-rv-parks","status":"publish","type":"post","link":"https:\/\/powertechelectrical.in\/index.php\/2021\/08\/30\/hitch-your-wagon-electrical-contractors-find-opportunities-at-rv-parks\/","title":{"rendered":"Hitch Your Wagon: Electrical contractors find opportunities at RV parks"},"content":{"rendered":"\n<p>For electrical contractors located near leisure areas or national parks, consider working at recreational vehicle (RV) parks. Like mini towns or allotments, RV parks require the same type of electrical work as most other jobs\u2014upgrades, renovation, replacing transformers\u2014albeit with more consideration needed for weather, terrain and the vacation season. Many electrical contractors, especially those out west, are taking advantage of this work.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Mills Electric Co.<\/h4>\n\n\n\n<p>The company usually does two or three complete jobs a year that involve total upgrades, and it also does a lot of regular maintenance and repair work.<\/p>\n\n\n\n<p>\u201cSome of these parks that have been around since the 1960s are at \u2018end of life\u2019 when it comes to electrical work,\u201d said Ryan Taylor, project manager. \u201cThese are the parks where we do total upgrades and replacements.\u201d<\/p>\n\n\n\n<p>The company is currently involved in a full replacement project of a facility that consists of 420 units on 180 acres with six and a half miles of ditch. This involves working with the local utility to get new transformers installed, all underground cabling and vaults, and the installation of new distribution panels and pedestals.<\/p>\n\n\n\n<p>\u201cWe will end up installing 49,000 linear feet of direct-bury cable,\u201d Taylor said.<\/p>\n\n\n\n<p>While Mills Electric finds it easy to work with the local utility, this kind of work is new to some cable and internet providers, according to Huntley, so there is a learning curve and requires some coordination. In particular, rough terrain en route to the park sites can cause issues.<\/p>\n\n\n\n<p>\u201cWe are in the woods, and there are trees all around,\u201d Huntley said.<\/p>\n\n\n\n<p>This makes trenching difficult for some of these providers. Also, in a lot of cases, underground wiring isn\u2019t well-documented.<\/p>\n\n\n\n<p>Huntley said he hasn\u2019t seen any demand for solar or other types of renewable power.<\/p>\n\n\n\n<p>\u201cMost of the people are here just to get away, and they want to be deep in the woods, where it really doesn\u2019t make sense to install renewables,\u201d he said.<\/p>\n\n\n\n<p>Huntley said that lightning protection comes down to climate and historical activity.<\/p>\n\n\n\n<p>\u201cThe east side of Washington state is drier and has more lightning strikes. We recommend looking at it on a site-by-site basis and address the risks with clients,\u201d he said.<\/p>\n\n\n\n<p>For Mills Electric, the biggest challenge in terms of working on RV parks is weather.<\/p>\n\n\n\n<p>\u201cMost of the people want to be in the parks in spring and summer, so we do most of our work in the fall and winter, which tends to be very wet around here,\u201d Huntley said. \u201cWe have to deal with a lot of mud.\u201d<\/p>\n\n\n\n<p>However, there are only two things that would really stop the company from working on any given day. One is really high winds, which could knock trees down, and, that, of course, would be a safety hazard.<\/p>\n\n\n\n<p>\u201cWe also have to stop working when it gets below 28\u00b0F, because the trucks that come in to do the trenching for the underground cable aren\u2019t able to work in those conditions, because the underground water is too cold,\u201d Huntley said. \u201cIt crystallizes as it gets sucked up into the tank.\u201d<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"http:\/\/powertechelectrical.in\/wp-content\/uploads\/2021\/08\/jump_shutterstock_241674517-1024x1024.jpg\" alt=\"\" class=\"wp-image-326\" srcset=\"https:\/\/powertechelectrical.in\/wp-content\/uploads\/2021\/08\/jump_shutterstock_241674517-1024x1024.jpg 1024w, https:\/\/powertechelectrical.in\/wp-content\/uploads\/2021\/08\/jump_shutterstock_241674517-300x300.jpg 300w, https:\/\/powertechelectrical.in\/wp-content\/uploads\/2021\/08\/jump_shutterstock_241674517-150x150.jpg 150w, https:\/\/powertechelectrical.in\/wp-content\/uploads\/2021\/08\/jump_shutterstock_241674517-768x768.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Quality Electric Inc.<\/h4>\n\n\n\n<p>Quality Electric Inc., Boise, Idaho, also does some RV work.<\/p>\n\n\n\n<p>\u201cIn fact, working on these jobs is among my favorite things to do, because they are in such great locations,\u201d said David Bradshaw, department manager.<\/p>\n\n\n\n<p>In terms of frequency, the jobs tend to \u201ccome in waves,\u201d Bradshaw said. \u201cThere may be some years where we do several, then other years where we end up doing none.\u201d<\/p>\n\n\n\n<p>Much depends on RV park owners. Some owners have several parks and want Quality Electric to do work on several of them during the year. Other years, it might just be a one-off at a small park.<\/p>\n\n\n\n<p>On the large jobs, one key aspect is working with the local utility and setting the high-voltage transformers.<\/p>\n\n\n\n<p>\u201cIn some cases, on large projects, the utility will end up having to upsize its lines and the transformers that serve the parks,\u201d he said. In addition, some of the large RV parks have their own indoor electrical rooms.<\/p>\n\n\n\n<p>Project size can grow in other ways, too.<\/p>\n\n\n\n<p>\u201cYears ago, we tended to install 30-amp pedestals,\u201d Bradshaw said. \u201cThen, we started installing 50A. These days, it\u2019s not uncommon for us to install 100A pedestals.\u201d<\/p>\n\n\n\n<p>The company also may need to trench in larger conduits.<\/p>\n\n\n\n<p>Quality Electric experiences some of the same challenges that Mills Electric does, especially when it comes to the fact that a lot of the work needs to take place during the colder months. It can be tough to work during the summer when visitors to the parks want to relax and not have a lot of contractor activity around them.<\/p>\n\n\n\n<p>Location can be another challenge.<\/p>\n\n\n\n<p>\u201cA lot of these parks are in remote locations,\u201d Bradshaw said. \u201cFor example, we have had to drive hours just to get to a location in order to bid on it in the first place.\u201d<\/p>\n\n\n\n<p>And, when a project does occur, there can be occasions where the crew will run into a lot of rocks and will have to rock-saw their way through the area in order to dig trenches.<\/p>\n\n\n\n<p>However, most utilities that serve the parks where Quality Electric works are very easy to coordinate with so that makes the job go smoothly.<\/p>\n\n\n\n<p>While demand for renewables is not large, the company does occasionally do RV park projects that involve solar.<\/p>\n\n\n\n<p>\u201cThese tend to be federal parks, because they have a lot of requirements for energy savings,\u201d he said. \u201cWe did one project that involved installing a rather large solar farm.\u201d<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Frahler Electric<\/h4>\n\n\n\n<p>Frahler Electric, Tigard, Ore., got involved in RV park work the first time rather unexpectedly.<\/p>\n\n\n\n<p>\u201cI received a call from a general contractor one day who was working on a park project on Mt. Hood and wanted us to bid on it,\u201d said Dan Petrin, project manager and estimator.<\/p>\n\n\n\n<p>The company ended up getting the job. It completed work on the first phase, which took place in 2017 and involved 80 sites, and is currently working on the second phase, which involves 108 additional sites.<\/p>\n\n\n\n<p>The first phase\u2019s first step, and one of the most challenging, was working with the utility to arrange power. Until then, the region where the RV park was being located had a low demand for power.<\/p>\n\n\n\n<p>\u201cSo, the first thing, was getting all of the transformers, vaults and other utility requirements taken care of,\u201d Petrin said.<\/p>\n\n\n\n<p>Another challenge related to the other utilities\u2014water, sewer, cable and internet\u2014that were also working on the project.<\/p>\n\n\n\n<p>\u201cThe owner wanted each site handled separately, which means separate metering, water lines, cable drops, etc., which makes things interesting,\u201d he said. \u201cAs such, we had to spend a lot of time working on the design. It wasn\u2019t just a matter of running a long extension cord from the highway to the park!\u201d<\/p>\n\n\n\n<p>A third challenge related to weather.<\/p>\n\n\n\n<p>\u201cWe started both phases late in the year, which is when there is a lot of rain and then a lot of mud,\u201d Petrin said. \u201cAnd, of course, when a storm comes through, all work stops until emergency services are taken care of and then we can get back on schedule.\u201d<\/p>\n\n\n\n<p>While lightning protection might be a consideration in remote areas, Petrin said such strikes are minimal in Oregon, compared to other parts of the country.<\/p>\n\n\n\n<p>\u201cThis RV park being surrounded by 100-ft. trees that are typically wet will be the best protection, as they will likely get the strikes.\u201c<\/p>\n\n\n\n<p>\u201cIf the opportunity arises for more RV park work in the future, we would definitely consider it,\u201d Petrin said. \u201cThe owner of this park actually owns other parks all around the country, so more work may be possible, especially if he is interested in work on some of the local RV parks.\u201d<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">J. Pollock Electric<\/h4>\n\n\n\n<p>Most of the RV work that J. Pollock Electric, Overgaard, Ariz., handles is with existing parks that need pedestal repairs.<\/p>\n\n\n\n<p>\u201cWe also do a lot of work with RV owners who need new wiring,\u201d said Jesse Pollock, owner. \u201cWe haven\u2019t ever wired a park from scratch.\u201d<\/p>\n\n\n\n<p>Pollock finds that there is always enough work to keep him busy, because he focuses a lot of attention on marketing.<\/p>\n\n\n\n<p>\u201cFor example, I go around to RV parks and give business cards to the park owners, and the park owners then give my information to the owners of the RVs, who then call me for work,\u201d he said.<\/p>\n\n\n\n<p>Some park owners actually own several parks, so Pollock\u2019s marketing efforts with a single individual can pay dividends with work in several different parks over time.<\/p>\n\n\n\n<p>Another way he gets new work is by putting on seminars at various parks, informing people of new products and technologies, such as surge protectors, which can vary by location, and which, he said, are becoming more important.<\/p>\n\n\n\n<p>Pollock also stays abreast of new products and technology.<\/p>\n\n\n\n<p>\u201cThere is a lot of equipment being offered by different manufacturers, so I spend time reading their manuals,\u201d he said.<\/p>\n\n\n\n<p>As noted, most of his work is traditional.<\/p>\n\n\n\n<p>\u201cSome of these parks have been around since the 1930s,\u201d he said. \u201cA lot of it is still above-ground wiring.\u201d<\/p>\n\n\n\n<p>While some park owners have thought about moving to solar plus battery, none of the ones with which Pollock has been involved with have moved this direction yet.<\/p>\n\n\n\n<p>His biggest challenge is often scheduling.<\/p>\n\n\n\n<p>\u201cThe town and surrounding community can double in size from about 15,000 people to 30,000 people at certain times of the year, so demand increases a lot then,\u201d Pollock said. \u201cAs a result, I just need to figure out a way to schedule everything and get the work done. If I get really busy, customers often just have to wait.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For electrical contractors located near leisure areas or national parks, consider working at recreational vehicle (RV) parks. Like mini towns or allotments, RV parks require the same type of electrical work as most other jobs\u2014upgrades, renovation, replacing transformers\u2014albeit with more consideration needed for weather, terrain and the vacation season. Many electrical contractors, especially those out [&hellip;]<\/p>\n","protected":false},"author":123457,"featured_media":327,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-325","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/powertechelectrical.in\/index.php\/wp-json\/wp\/v2\/posts\/325","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/powertechelectrical.in\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/powertechelectrical.in\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/powertechelectrical.in\/index.php\/wp-json\/wp\/v2\/users\/123457"}],"replies":[{"embeddable":true,"href":"https:\/\/powertechelectrical.in\/index.php\/wp-json\/wp\/v2\/comments?post=325"}],"version-history":[{"count":1,"href":"https:\/\/powertechelectrical.in\/index.php\/wp-json\/wp\/v2\/posts\/325\/revisions"}],"predecessor-version":[{"id":328,"href":"https:\/\/powertechelectrical.in\/index.php\/wp-json\/wp\/v2\/posts\/325\/revisions\/328"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/powertechelectrical.in\/index.php\/wp-json\/wp\/v2\/media\/327"}],"wp:attachment":[{"href":"https:\/\/powertechelectrical.in\/index.php\/wp-json\/wp\/v2\/media?parent=325"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/powertechelectrical.in\/index.php\/wp-json\/wp\/v2\/categories?post=325"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/powertechelectrical.in\/index.php\/wp-json\/wp\/v2\/tags?post=325"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}